The team at St. Lawrence Erectors, a subsidiary of Canam Group, successfully executed a large-scale lifting operation over the Lachine Canal in the scope of the KPH Turcot design-build project. A 164-foot (50-meter), 300,000-lb (136,000-kilo) section composed of two preassembled steel girders was lifted over the waters of Lachine Canal. The crane used to lift the section, which will form part of the new Highway 15 bridge over the canal,…
Learn more